Emergency cooling measures and operational continuity support in the event of a turbo chiller failure.
BCP measures for cooling equipment failure. Case study of temporary cooling system implementation.
Failures or regular maintenance of existing cooling equipment such as chillers, refrigeration units, and cooling towers pose significant risks that can lead to production stoppages or reduced equipment capacity. Aggreko provides cooling solutions that combine temporary chillers, pumps, power distribution panels, cables, and piping equipment. In this case, we quickly established a temporary chiller system in response to an unexpected failure of the existing cooling equipment, ensuring the necessary cooling capacity and minimizing the impact on operations. We support various industries, including manufacturing, chemicals, food, pharmaceuticals, and steel, with measures against refrigeration unit failures, emergency cooling, backup cooling during equipment updates, regular maintenance responses, and BCP measures.
- Company:Aggreko Japan
- Price:Other